Towcester Community Centre

Our products were recently installed at Towcester Community Centre, a new build project which boasted a £2.4m contract value and a 32 week build term.

The prestigious project is one which we are exceptionally proud to have been involved with, and the end result is nothing short of exceptional. HBG Limited and Thorn Electrical, our NICEIC Contractor contact who facilitated the project, ensured that the installation was a complete success. We would like to thank both organisations for creating and sharing an outstanding video relating to the project, with an edited version of the footage shown below:
Our products were used across the site, with a significant number of our fittings selected for the project. Our Arial LED 600x600 Backlit Panels were installed in several areas at various mounting heights, providing a low-glare solution for the spaces where this was deemed to be a requirement. Alongside our Arial LED 600x600 Backlit Panels, our Dura LED Anti-Corrosive Battens were chosen for areas where IP65 ingress protection was a key factor, with the fitting proving to be an excellent option within the Changing Rooms and Kitchens.

The BELL Lighting portfolio extended further for the project, with our Mentor LED CCT Wattage Switchable IP40 Battens installed in spaces where an aesthetically pleasing finish, along with low-glare requirements and IP40 ingress protection, was needed.

Finally, our Aqua LED CCT IP65 Bulkheads were used in Circulation Areas and Stairwells, with our Arial Round LED Panels selected within other General Areas, and our LED Floodlights were installed to external columns in order to illuminate the exterior parking areas.
We are delighted that BELL Lighting were the chosen manufacturer for this exciting project, and we would like to thank everyone who was involved in ensuring that the lighting installation was a resounding success. We look forward to working on similar projects in the weeks and months to come.